Hyderabad Metro Phase 2: Maps, Route, Timings, and More
5.4K
2
Contents
The Hyderabad Metro Phase 2 project is set to expand the city’s connectivity, ensuring efficient public transportation across major commercial and residential hubs. Spanning 63 km, this phase will enhance the existing metro network, which already covers 70 km. Residents from areas like Gachibowli, Shamshabad Airport, and Patancheru will have faster, safer commutes. With an estimated cost of ₹24,200 crore, the project aims to significantly reduce traffic congestion and support sustainable city growth.
Extended Routes for Better Connectivity
The metro phase 2 Hyderabad map outlines five key corridor extensions, designed to connect vital city locations:
- Miyapur to Patancheru (14 km, Red Line): A boon for commuters in the bustling IT and industrial hubs.
- Nagole to Shamshabad Airport via LB Nagar (29 km, Blue Line): This line eases airport access.
- Raidurg to Kokapet (8 km, Blue Line): This route caters to growing residential areas like Kokapet.
- LB Nagar to Hayathnagar via Vanasthalipuram (8 km, Red Line): Connecting suburban clusters to the metro.
- MGBS to Falaknuma (7 km, Green Line): Finally bridging connectivity to Hyderabad’s Old City.
These routes will integrate landmarks like HITEC City, Shamshabad Airport, and the Outer Ring Road.
Hyderabad Metro Airport Express Line
The dedicated Airport Express Line, part of Hyderabad Metro Phase 2, connects Mindspace Junction to Rajiv Gandhi International Airport. This 32 km semi-high-speed line promises a swift commute at speeds of up to 120 km/h. It features eight stations, including Biodiversity Junction, Narsingi, and Shamshabad. Whether for daily flyers or tourists, this line ensures smooth transit to the airport.
Timings and Infrastructure
Once operational, metro phase 2 Hyderabad trains will run from 6 AM to 11 PM, mirroring the Phase 1 schedule. The extended lines will include both elevated and underground tracks, designed to maintain seamless traffic flow.
The development includes advanced safety features and energy-efficient trains with expandable three to six-coach configurations. Commuters can expect state-of-the-art ticketing and facilities like the Green Miles Loyalty Club, rewarding sustainable travel.
The Final Word
The Hyderabad Metro Phase 2 project is a transformative initiative, addressing the city’s growing transportation demands. From improved airport access to better suburban connectivity, the expanded metro network is poised to revolutionise daily commutes. By reducing traffic congestion and pollution, this extension promotes a sustainable, commuter-friendly Hyderabad. As construction progresses, the metro stands as a testament to modern urban development.
Frequently Asked Questions
What areas does the Hyderabad Metro Phase 2 project cover?
Ans. The Hyderabad Metro Phase 2 project covers new routes to Patancheru, Kokapet, Shamshabad Airport, Hayathnagar, and Falaknuma, enhancing connectivity.
When will metro phase 2 Hyderabad become operational?
Ans. The metro phase 2 Hyderabad project is expected to complete by 2030, with staggered launches improving connectivity earlier in select routes.


