Specifications

Belvedere & Pinecrest Towers

Click below to view details

Flooring

  • Living/Dining/Bedrooms : Vitrified tiles 3' x 3'
  • Passages : Vitrified tiles 3' x 3'
  • Entrance Lobby : Vitrified tiles 3' x 3'
  • Balcony : Vitrified tiles

Wall Finishing

  • External : Acrylic Emulsion paint
  • Internal : Putty finish
  • Lift lobby : ABD for stilt floor & OBD for upper floors

Lift

  • Two no. of Elevators in each Tower

Kitchen

  • Flooring : Vitrified Tiles
  • Wall finishes : Putty finish
  • Fittings : Vinod Stainless Steel Sink with drainboard
  • Dado : Glazed Ceramic tile upto 2 feet above granite counter
  • Modular Kitchen : Below the counter, shutters only
  • Service Counter : Granite Service Counter
  • Others : Plumbing & Electrical point for water purifier & washing machine, Electrical point for Exhaust Fan

Doors

  • Frame : Teak Wood for main door/ Red Meranti for other doors
  • Main door : Flush door with Teak composed veneer on outside & painted finish on inside
  • Internal doors : Flush door with enamel paint on both side

Windows

  • All rooms : UPVC sliding windows

Toilets

  • Flooring : Anti Skid Ceramic Tiles
  • Dado : Glazed Ceramic tile up to 7 feet
  • Fittings in Master bedroom toilet : Wall Mounted WC, Italian Marble Counter sunk washbasin, Three in one wall mixer, Health faucet
  • Fittings in other toilets : Wall Mounted WC, Bracket Mounted washbasin, Health faucet
  • Others: Electrical & Plumbing Provision for Geyser

Electricals

  • Concealed copper wiring, Modular type Swithches , Miniature circuit breakers ( MCBs & MCCBs), Telephone points in living room & master bedroom ,AC Points in each room, TV point in living room & Master Bedroom, Provision for video phone, Provision of Internet in Master bedroom, other bedroom and study room

Power back-up

  • DG back-up for lifts and common areas in building

Orchard, Eden and Tivoli Towers

Click below to view details

Flooring

  • Living/Dining/Bedrooms : Vitrified tiles 2' x 2'
  • Passages : Vitrified tiles 2' x 2'
  • Entrance Lobby : Vitrified tiles 2' x 2'
  • Balcony : Ceramic Tiles

Wall Finishing

  • External : Acrylic Emulsion paint
  • Internal : Putty finish
  • Lift lobby : ABD for stilt floor & OBD for upper floors

Lift

  • Two no. of Elevators in each Tower

Kitchen

  • Flooring : Ceramic Tiles
  • Wall finishes : Putty finish
  • Kitchen Counter : Granite Counter
  • Fittings : Stainless Steel Sink
  • Dado : Glazed Ceramic tile upto 2 feet above granite counter
  • Modular Kitchen : Below the counter, shutters only
  • Service Counter : Granite Service Counter
  • Others : Plumbing & Electrical point for water purifier & washing machine, Electrical point for Exhaust Fan

Doors

  • Frame : Teak Wood for main door/ Red Meranti for other doors
  • Main door : Flush door with Teak composed veneer on outside & painted finish on inside
  • Internal doors : Flush door with enamel paint on both side

Windows

  • All rooms : UPVC sliding windows

Toilets

  • Flooring : Anti skid ceramic Tiles
  • Dado : Glazed ceramic tile up to 7 feet
  • Fittings : Wall Mounted WC, Granite counter sunk wash basin for master bedroom toilet, Bracket mounted wash basin for other toilets, Two in one Shower mixer, health faucet
  • Others : Electrical & Plumbing Provision for Geyser

Electricals

  • Concealed copper wiring, Modular type switches, AC points in Master bedroom and other bedroom, Miniature circuit breakers ( MCBs), Telephone points in living room & master bedroom, TV point in living room, TV Point in Master Bedroom (2 & 3 BHK- Option II only), Provision for video phone (2 & 3 BHK- Option II only), Provision of Internet in Master Bedroom (2 & 3 BHK- Option II only)

Power back-up

  • DG back-up for lifts and common areas in building
 